Anderlingen-Ohrel, Germany
Facts & Figures
Genset / gas engine (R 029): | 1 x TCG 2016 V08 C in container 1 x TCG 2016 V16 B |
Segment / gas type: | Biogas |
Customer: | Anderlingen, Germany |
Total output: | 400 kWel + 716kWel |
Commissioning: | 2009 + 2007 |
A container-hosted TCG 2016 V08 C generates 3,200 MWh of power and 2,552 MWh of heat a year, which are used for the biogas plant.
Additionally, a previously installed TCG 2016 V16 B, which runs on gas from the same power plant, supplies a local heat network. The integrated MWM biogas processing secures the technology bonus according to the German Renewable Energies Act (EEG).