1990/91
New DEUTZ MWM Ship Engine for German Sail Training Ship “Gorch Fock”
Improved Maneuverability and Performance
The German marine’s sail training ship “Gorch Fock”, sometimes also called “Gorch Fock II”, has been in service since 1958. Today, the “Gorch Fock I” is moored in Stralsund’s museum harbor. In winter 1990/91, the “Gorch Fock II” was equipped with a new DEUTZ MWM ship engine of the type SBV6M628 in order to increase the performance and maneuverability of the sail training ship. Thanks to the DEUTZ MWM engine, whose six-cylinder version has an output of 1,220 kW, the performance was doubled compared to the replaced main engine. With the DEUTZ MWM engine, the “Gorch Fock” is able to maneuver safely and speedily even in more difficult waters and heavy seas. The new propulsion engine was mounted through the hull, which was cut open at the side. Apart from the propulsion system, the ship’s power generation system was modernized as well. For this purpose, the “Gorch Fock” was equipped with three DEUTZ MWM 234 on-board generator sets with six-cylinder engines of the 234 series. Each of these generator sets delivers 185 kW to the on-board grid, more than doubling the available power of the on-board grid.
READ MORE ...
MWM History. Future Needs Tradition.
More about the history of the company, the MWM brand and the experience in developing and optimizing stationary gas engines.
Read moreInstallation of a Large MWM Engine in "Minna Horn"
A large MWM engine was supplied for a freighter.
Read morePerformance of MWM Ship Diesel Engines Boosted
Thanks to the improved performance of the MWM ship diesel engines in 1961, the ship propellers reached speeds of up to 500 rpm.
Read moreLEARN MORE ...
Photo credits:
Source: Norbert Eisinger