Anderlingen-Ohrel, Germany

Facts & Figures
| Genset / gas engine (R 029): | 1 x TCG 2016 V08 C in container 1 x TCG 2016 V16 B |
| Segment / gas type: | Biogas |
| Customer: | Anderlingen, Germany |
| Total output: | 400 kWel + 716kWel |
| Commissioning: | 2009 + 2007 |
A container-hosted TCG 2016 V08 C generates 3,200 MWh of power and 2,552 MWh of heat a year, which are used for the biogas plant.
Additionally, a previously installed TCG 2016 V16 B, which runs on gas from the same power plant, supplies a local heat network. The integrated MWM biogas processing secures the technology bonus according to the German Renewable Energies Act (EEG).






































